NEWS AND HIGHLIGHTS
2024
OUR PROJECTS (PARTIAL LIST)
2023
OUR PROJECTS (PARTIAL LIST)2022
2022
February
Completed Lawrence Hall of Science Outdoor Nature Laboratory
Lutsko Associates Architect
3.25 Million, 32,000 SF Outdoor Learning Space
2022
May
James R. Griffin, Inc. Receives
CEA President’s Safety Award of 2021
Construction Employers’ Association Serves
The 46 Northern California County Construction Industry
2022
August
Celebration
110 Years of Family Construction
Swiss Park, Newark, August 12, 2022
Jim’s Birthday
2022
Randy Griffin
Company President
Recently completed a two-year chairmanship as Safety Committee Chairman for the Forty-Six Northern California County Construction Employers’ Association (CEA) which has been a leader in the successful mobilization of construction trades to combat Covid 19 in the construction workplace. Randy is a member of the CEA board of Directors.
2021
2021
Experience Modification
EMR Lowered to .76%
CURRENT RECORDS
8 years without job time loss due to injuries…
…and counting
61 years without a lawsuit or recorded claim with owners or design professionals
SIGNIFICANT PROJECTS
2018
AUDITORIUM RENOVATION
Renovation of the Wheeler Hall Auditorium at the University of California at Berkeley.
2016
CALIFORNIA PRESERVATION FOUNDATION AWARD
2016 Preservation Design Awards
In Recognition of Outstanding Achievement in the Field of Historic Preservation for the Senior Women’s Hall UC Berkeley
CEA SAFETY AWARDS
17 YEARS in a row including three President’s Awards
Dutra Mission Palms Office Building
Fremont
2014
100-year-old Girton Hall Relocation
James R. Griffin, Inc. 100th Anniversary Celebration
A photo gallery of the steam engine train ride
from Sunol to Niles and back,
and a picnic in Sunol Park.
2014
Varian Campus Center – Varian Medical Systems, Palo Alto
Cafeteria, Health Center, Auditorium and Meeting Rooms
32,000 Sq. Ft
Radiation Test Cells, Varian Medical Systems
Placed 1,200 yards of concrete in Ten Hours
More than 200 UC projects over 30 years
NATIONAL ENERGY RESEARCH COMPUTING CENTER (NERSC)
A DOE and Lawrence Berkeley National Laboratory project in Oakland. 3 MW upgrade; two chiller plants; infrastructure support of the 5th fastest Super Computer (Hopper). 24/7 facility remained in operation during construction.
Mills College Concert Hall, Oakland
Originally designed by Walter Ratcliff, Jr. and built in 1928, James R. Griffin, Inc. was entrusted to perform major seismic reconstruction work, including new foundations and concrete sheer walls. In the concert hall, the old floor framing and walls were demolished and new reconfigured floors and seating were installed.
HISTORIC CONCERT HALL
New undulating walls were constructed to improve acoustics and enhance the beauty of the room. A new roof with seismic connections and acoustic improvements was installed along with new heating and electric systems, new office and bathroom wing and a new elevator. All concrete and framing operations were conducted by the crews of James R, Griffin, Inc. The project was completed on time and under budget.
AWARDS
- 2009 California Restoration Award in the Larger Projects Category
- Society for College and University Planning (SCUP) Award
- Building America Award for “one of the “most imaginative, unique and immaculate projects in the North West”, by Real Estate & Construction Review
BETTY IRENE MOORE NATURAL SCIENCES BUILDING
MILLS COLLEGE, OAKLAND
James R. Griffin, Inc. was selected as a member of a multi-discipline team to design and build a 26,000 sq. ft. addition to the Sciences Buildings complex in the heart of the Mills College campus in Oakland with the goal of achieving LEED Gold certification.
Working closely with the campus architect, our company was active in finding ways to raise the certification to LEED PLATINUM LEVEL while remaining on budget and on schedule. Included in the project were significant modifications within the 46,000 sq. ft. multi-building complex.
Russian Hill Apartment