NEWS & HIGHLIGHTS

2022

February

FEBRUARY 2022

Completed Lawrence Hall of Science Outdoor Nature Laboratory

• Lutsko Associates Architect
• 3.25 Million
• 32,000 SF Outdoor Learning Space

MAY 2022

James R. Griffin, Inc. Receives CEA President’s Safety Award of 2021
Construction Employer’s Association Serves
The 46 Northern California County Contraction Industry.

JULY 2022

Completed Dominican Sisters Rosary Building Renovation

Pica + Sullivan Architect

Yearlong project Successfully completed on time

Building originally Built in 1931

August 2022

Celebration 110 Years of Family Construction

Swiss Park, Newark, August 12, 2022,  Jim’s Birthday

RECENT ACCOMPLISHMENTS

2021

HASS MBA Student Lounge

Completed October, 2021

NEWS

Randy Griffin

Company President

Recently completed a two-year chairmanship as Safety Committee Chairman for the  Forty-Six Northern California Counites’ Construction Employers’ Association (CEA) which has been a leader in the successful mobilization of construction trades to combat Covid 19 in the construction workplace.

Randy has recently been appointed to the Board of Directors for CEA.

RECENT ACCOMPLISHMENTS

2021

EXPERIENCE MODIFICATION

EMR. Lowered to .71

The Lowest and Best Possible for Companies of our Size
Safety awards – 16 in a row.

CURRENT RECORDS

8 Years without job time loss due to injuries…

…and counting

61 years without a lawsuit or recorded claim with owners or design professionals

SIGNIFICANT PROJECTS

2018

AUDITORIUM RENOVATION

Renovation of the Wheeler Hall Auditorium at the University of California at Berkeley.

2016 Preservation Design Awards

In Recognition of Outstanding Achievement
in the Field of Historic Preservation for the

Senior Women’s Hall
UC Berkeley

CEA Safety Award ~

16 Years in a Row

RECENT PROJECT OWNERS (Partial list)

RECENT PROJECT OWNERS (Partial list).

Amazon

Applied Materials

Broadcom

Sandia National Laboratories/California

Lawrence Berkeley National Laboratories

Lumileds, San Jose

Lawrence Hall of Science, Berkeley

Nikon

Mills College, Oakland

Varian Medical Systems, Pal Alto

University of California, Berkeley

University of California, Santa Cruz

Dominican Sisters, Mission San Jose

Washington Hospital Healthcare Systems, Fremont

Dutra Mission Palms Office Building, Fremont

Memorial Stadium Visitor Center
UC Berkeley

100-year-old Girton Hall

a two-story Julia Morgan House, move to UC Berkeley Botanical Gardens
UC Berkeley
Girton Hall

Varian Campus Center – Varian Medical Systems, Palo Alto

Completed February 2013
Cafeteria, Health Center, Auditorium and Meeting Rooms
32,000 Sq. Ft

Radiation Test Cells, Varian Medical Systems.

Placed 1200 yards of concrete in Ten Hours

More than 150 UCB projects over 30 years

NATIONAL ENERGY RESEARCH COMPUTING CENTER (NERSC)

A DOE and Lawrence Berkeley National Laboratory project in Oakland. 3 MW upgrade; two chiller plants; infrastructure support of the 5th fastest Super Computer (Hopper). 24/7 facility remained in operation during construction.

Mills College Concert Hall, Oakland

Originally designed by Walter Ratcliff, Jr. and built in 1928, James R. Griffin, Inc. was entrusted to perform major seismic reconstruction work, including new foundations and concrete sheer walls. In the concert hall the old floor framing and walls were demolished and new reconfigured floors and seating installed. … read more

HISTORIC CONCERT HALL

New undulating walls were constructed to improve acoustics and enhance the beauty of the room. A new roof with seismic connections and acoustic improvements was installed along with new heating and electric systems, new office and bathroom wing and a new elevator. All concrete and framing operations were conducted by the crews of James R, Griffin, Inc. The project was completed on time and under budget. Cost: $8,000,000.

AWARDS

2009 California Restoration Award in the Larger Projects Category

Society for College and University Planning (SCUP) Award

Building America Award for “one of the “most imaginative, unique and immaculate projects in the North West”, by Real Estate & Construction Review

BETTY IRENE MOORE NATURAL SCIENCES BUILDING

MILLS COLLEGE, OAKLAND

James R. Griffin, Inc. was selected as a member of a multi discipline team to design and build a 26,000 sq. ft. addition to the Sciences Buildings complex in the heart of the Mills College campus in Oakland with the goal of achieving LEED Gold certification.
Working closely with the campus architect, our company was active in finding ways to raise the certification to LEED PLATINUM LEVEL while remaining on budget and on schedule. Included in the project were significant modifications within the 46,000 sq. ft. multi-building complex. Cost: $13,800,000.

Pacific Heights San Francisco Apartment Renovation Project

Published in Architectural Digest